Existing Project

Group 19

Roy Hill Project

Range of capabilities performed on this project

Our client had approached us to supply the labour to construct a camp site. We performed the following works:

  • Plumbing works
  • Electrical works
  • Refrigeration works
  • Installation of modular buildings
  • Interconnect the campsite with plumbing which would go to a waste water treatment plant.

Camp sit to house 300 people built within 21 days.